Out with the old , in with the new - building a new sea port Part 2

A building inspector came on site  and said that the tiling I had done on top of the piers was not up to code, and would have to have a plate placed underneath it.. As this would help with sinking the rails and track into the pier and giving it a smoother look, I agreed to go ahead with the work.
This meant pulling up all of the tile, across 9 baseplates.

 It took me around 3 hours all up, but I think it looks much better now.
I had thought about doing it form the beginning, and it would mean saving an entire layer of plate across the build which would have saved time and money.
But in the end, Lego can just be pulled apart and changed so easily, why not just do it!